Construction loans and knockdown-rebuild: progress payments, contracts and timeframes
Construction loans are paid out in stages as the builder finishes each part of the job, so you pay interest only on what has been drawn. 27 of the 40 tracked lenders publish construction policy, 20 reference fixed-price contracts, and most cap the build at 12–24 months.
Checked 24 Nov 2026
Current policy snapshot
Current policy snapshot
- Count
- 27
- Out of
- 40
- What happened
- 27 of 40 tracked lenders publish construction lending policy (7 major banks, 11 non-majors, 9 non-banks); 11 do not offer it.
LVR bands
- construction policy published
By lender type
- Major banks
- 7
- Non-major lenders
- 11
- Non-bank lenders
- 9
Current policy snapshot
- Count
- 20
- Out of
- 40
- What happened
- 20 reference a fixed-price building contract; 23 describe progress payment draws.
LVR bands
- fixed price referenced
By lender type
- Major banks
- 6
- Non-major lenders
- 8
- Non-bank lenders
- 6
Current policy snapshot
- Count
- 14
- Out of
- 40
- What happened
- 14 do not accept owner-builder construction; 7 consider it with restrictions.
LVR bands
- not accepted
By lender type
- Major banks
- 2
- Non-major lenders
- 7
- Non-bank lenders
- 5
Current policy snapshot
- Count
- 17
- Out of
- 40
- What happened
- Where a build period is stated, 6 allow 12 months, 5 15–18 months and 6 24 months.
LVR bands
- 12_months
- 15_months
- 18_months
- 24_months
By lender type
- Major banks
- 5
- Non-major lenders
- 5
- Non-bank lenders
- 7
How it works
- A construction loan is drawn in progress payments: typically deposit, base or slab, frame, lock-up, fit-out and completion. Before each draw the builder invoices, and the lender may send a valuer to confirm the stage is finished.
- Lenders usually want a fixed-price contract with a licensed builder (often an HIA or Master Builders contract), plans, specifications and insurance. The valuation is "on completion", so the land value plus the finished home must support the loan.
- In a knockdown-rebuild you keep the land and replace the house. You may need to pay out or restructure the existing loan, fund demolition, and cover rent while you are out of the home, so plan the cash flow before you sign.
Upfront and ongoing costs
- Progress inspection or valuation fees for each draw with some lenders.
- Variations to the contract, which you usually fund in cash before the next draw.
- Demolition, site costs, service connections and council or certifier fees not in the fixed price.
- Rent or temporary housing during the build, plus interest on drawn funds.
- Holding costs if the build runs late or the builder fails.
Watch-outs
- Check the builder's licence and home warranty insurance before signing.
- Lenders set a start deadline (often within 6–12 months of approval) and a maximum build period; delays can trigger reassessment.
- Owner-builder projects are declined by many lenders; check policy before buying land.
- Cost overruns usually come from your own funds, so keep a buffer.
- Lenders may hold back the final payment until an occupancy certificate is issued.
Policy sources
broker policy library lender policy export, 24 November 2026, 40 tracked lenders (8 major banks, 14 non-major banks, 18 non-banks); lenders anonymised.
Anonymised policy counts by lender type
Do lenders fund construction?
- Question
- Do lenders fund construction?
- Lenders in the snapshot
- 40
- How lenders were counted
- Each lender counted once, only where its policy wording states the rule; silent lenders are "not stated in tracked policy export".
- What this means
- About two-thirds of tracked lenders fund construction; several non-banks do not.
Policy categories
- Construction Loans
Lenders by type
- Major banks
- 8
- Non-major lenders
- 14
- Non-bank lenders
- 18
LVR bands
Construction lending offered with published policy
- LVR band
- construction policy published
- Count
- 27
- Share
- 27 of 40 tracked lenders
By lender type
- Major banks
- 7
- Non-major lenders
- 11
- Non-bank lenders
- 9
Construction product listed, no detail
- LVR band
- product listed no detail
- Count
- 1
- Share
- 1 of 40 tracked lenders
By lender type
- Major banks
- 0
- Non-major lenders
- 0
- Non-bank lenders
- 1
Construction loans not offered
- LVR band
- not offered
- Count
- 11
- Share
- 11 of 40 tracked lenders
By lender type
- Major banks
- 1
- Non-major lenders
- 3
- Non-bank lenders
- 7
Not stated in tracked policy export
- LVR band
- not stated
- Count
- 1
- Share
- 1 of 40 tracked lenders
By lender type
- Major banks
- 0
- Non-major lenders
- 0
- Non-bank lenders
- 1
Does the policy refer to a fixed-price building contract?
- Question
- Does the policy refer to a fixed-price building contract?
- Lenders in the snapshot
- 40
- How lenders were counted
- Each lender counted once, only where its policy wording states the rule; silent lenders are "not stated in tracked policy export".
- What this means
- A fixed-price contract with a registered builder is the norm; cost-plus contracts are restricted or capped at lower LVRs.
Policy categories
- Construction Loans
Lenders by type
- Major banks
- 8
- Non-major lenders
- 14
- Non-bank lenders
- 18
LVR bands
Fixed-price building contract referenced
- LVR band
- fixed price referenced
- Count
- 20
- Share
- 20 of 40 tracked lenders
By lender type
- Major banks
- 6
- Non-major lenders
- 8
- Non-bank lenders
- 6
Not referenced or no construction policy
- LVR band
- not stated
- Count
- 20
- Share
- 20 of 40 tracked lenders
By lender type
- Major banks
- 2
- Non-major lenders
- 6
- Non-bank lenders
- 12
Are owner-builder loans accepted?
- Question
- Are owner-builder loans accepted?
- Lenders in the snapshot
- 40
- How lenders were counted
- Each lender counted once, only where its policy wording states the rule; silent lenders are "not stated in tracked policy export".
- What this means
- Owner-builder finance is scarce: 14 tracked lenders rule it out and only 7 consider it, usually at a much lower LVR.
Policy categories
- Construction Loans
Lenders by type
- Major banks
- 8
- Non-major lenders
- 14
- Non-bank lenders
- 18
LVR bands
Owner-builder not accepted
- LVR band
- not accepted
- Count
- 14
- Share
- 14 of 40 tracked lenders
By lender type
- Major banks
- 2
- Non-major lenders
- 7
- Non-bank lenders
- 5
Considered with restrictions (lower LVR, land value only or case by case)
- LVR band
- considered with restrictions
- Count
- 7
- Share
- 7 of 40 tracked lenders
By lender type
- Major banks
- 4
- Non-major lenders
- 3
- Non-bank lenders
- 0
Not stated or no construction lending
- LVR band
- not stated
- Count
- 19
- Share
- 19 of 40 tracked lenders
By lender type
- Major banks
- 2
- Non-major lenders
- 4
- Non-bank lenders
- 13
What is the maximum construction period?
- Question
- What is the maximum construction period?
- Lenders in the snapshot
- 40
- How lenders were counted
- Each lender counted once, only where its policy wording states the rule; silent lenders are "not stated in tracked policy export".
- What this means
- Build windows run from 12 to 24 months; overruns can trigger rate loadings, re-assessment or conversion to principal and interest.
Policy categories
- Construction Loans
Lenders by type
- Major banks
- 8
- Non-major lenders
- 14
- Non-bank lenders
- 18
LVR bands
12 months
- LVR band
- 12_months
- Count
- 6
- Share
- 6 of 40 tracked lenders
By lender type
- Major banks
- 0
- Non-major lenders
- 4
- Non-bank lenders
- 2
15 months
- LVR band
- 15_months
- Count
- 1
- Share
- 1 of 40 tracked lenders
By lender type
- Major banks
- 0
- Non-major lenders
- 1
- Non-bank lenders
- 0
18 months
- LVR band
- 18_months
- Count
- 4
- Share
- 4 of 40 tracked lenders
By lender type
- Major banks
- 0
- Non-major lenders
- 0
- Non-bank lenders
- 4
24 months
- LVR band
- 24_months
- Count
- 6
- Share
- 6 of 40 tracked lenders
By lender type
- Major banks
- 5
- Non-major lenders
- 0
- Non-bank lenders
- 1
Not stated or no construction lending
- LVR band
- not stated
- Count
- 23
- Share
- 23 of 40 tracked lenders
By lender type
- Major banks
- 3
- Non-major lenders
- 9
- Non-bank lenders
- 11
How soon must construction start?
- Question
- How soon must construction start?
- Lenders in the snapshot
- 40
- How lenders were counted
- Each lender counted once, only where its policy wording states the rule; silent lenders are "not stated in tracked policy export".
- What this means
- If you buy land now and build later, check the start deadline: it can be as short as 6 months.
Policy categories
- Construction Loans
Lenders by type
- Major banks
- 8
- Non-major lenders
- 14
- Non-bank lenders
- 18
LVR bands
Within 6 months of settlement
- LVR band
- within_6_months
- Count
- 3
- Share
- 3 of 40 tracked lenders
By lender type
- Major banks
- 0
- Non-major lenders
- 0
- Non-bank lenders
- 3
Within 9 months of settlement
- LVR band
- within_9_months
- Count
- 1
- Share
- 1 of 40 tracked lenders
By lender type
- Major banks
- 0
- Non-major lenders
- 0
- Non-bank lenders
- 1
Within 12 months (of land settlement, disclosure or offer date)
- LVR band
- within_12_months
- Count
- 4
- Share
- 4 of 40 tracked lenders
By lender type
- Major banks
- 4
- Non-major lenders
- 0
- Non-bank lenders
- 0
Not stated
- LVR band
- not stated
- Count
- 32
- Share
- 32 of 40 tracked lenders
By lender type
- Major banks
- 4
- Non-major lenders
- 14
- Non-bank lenders
- 14
Does the policy describe progress-payment drawdowns?
- Question
- Does the policy describe progress-payment drawdowns?
- Lenders in the snapshot
- 40
- How lenders were counted
- Each lender counted once, only where its policy wording states the rule; silent lenders are "not stated in tracked policy export".
- What this means
- Funds are released in stages against builder invoices and progress inspections, with interest charged only on what has been drawn.
Policy categories
- Construction Loans
Lenders by type
- Major banks
- 8
- Non-major lenders
- 14
- Non-bank lenders
- 18
LVR bands
Progress-payment drawdowns described
- LVR band
- progress draws described
- Count
- 23
- Share
- 23 of 40 tracked lenders
By lender type
- Major banks
- 7
- Non-major lenders
- 10
- Non-bank lenders
- 6
Not described or no construction policy
- LVR band
- not stated
- Count
- 17
- Share
- 17 of 40 tracked lenders
By lender type
- Major banks
- 1
- Non-major lenders
- 4
- Non-bank lenders
- 12
Does the policy name HIA or Master Builders contracts?
- Question
- Does the policy name HIA or Master Builders contracts?
- Lenders in the snapshot
- 40
- How lenders were counted
- Each lender counted once, only where its policy wording states the rule; silent lenders are "not stated in tracked policy export".
- What this means
- Industry-standard HIA or Master Builders contracts are the safest format to give a lender.
Policy categories
- Construction Loans
Lenders by type
- Major banks
- 8
- Non-major lenders
- 14
- Non-bank lenders
- 18
LVR bands
HIA or Master Builders contract named
- LVR band
- hia mba named
- Count
- 9
- Share
- 9 of 40 tracked lenders
By lender type
- Major banks
- 1
- Non-major lenders
- 4
- Non-bank lenders
- 4
Not named
- LVR band
- not stated
- Count
- 31
- Share
- 31 of 40 tracked lenders
By lender type
- Major banks
- 7
- Non-major lenders
- 10
- Non-bank lenders
- 14
How the counts were verified
- Source
- Weekly scrape of a broker lender-policy library (40 active lenders, 2,938 policy rows, 88 categories), scraped 24 Nov 2026
- How lenders were counted
- A lender is counted only where its policy wording in the tracked export confirms the rule. "Not stated in tracked policy export" means the library had no detail, not that the lender never does it.
Important context
General information only, not financial, tax, legal or credit advice and not a loan assessment. Lender policies change often; a mortgage broker can check current policy for your situation.
Questions people ask
How do progress payments work?
The lender pays the builder in stages as each stage is completed and invoiced. 23 of 40 tracked lenders describe progress draws in their policy. You pay interest only on the amount drawn so far.
Do I need a fixed-price contract?
Most lenders prefer or require it. 20 tracked lenders reference fixed-price contracts, and 9 name standard HIA or Master Builders contracts.
Can I get a loan to build as an owner-builder?
It is difficult. 14 tracked lenders do not accept owner-builder construction and 7 consider it with restrictions such as lower LVR or completion requirements.
How long do I have to finish the build?
Usually 12–24 months. Where stated, 6 lenders allow 12 months and 6 allow 24 months. Many also require construction to start within 6–12 months of approval.
How is a knockdown-rebuild financed?
Usually as a construction loan secured by your existing land, with the current loan restructured or refinanced into it. The valuation is based on the land plus the completed home.
Next step
Speak to a broker
Sources
Figures checked 24 Nov 2026. Rules and thresholds change, so confirm with the official source before you rely on them.